Call us: 0800 792992 

Your residential building experts

Taranaki Bungalow

Work is underway on Pzazz Buildings latest project in New Plymouth where Isiah and his team are undertaking a renovation for Bruce Overden on his 120 year old villa. Having gone through a number of changes in it’s 120 year life including relocation, recladding and an extension - not all coordinated.

Scope of Renovation:

This project is being undertaken over four stages:

  • Stage one: Lounge, Kitchen Dining - the first task is to strip back to a cleaner canvas on which to open up the lounge and kitchen at the same time raising ceiling levels. From there walls and ceilings will be strapped and relined and a new kitchen installed.
  • Stage Two: Laundry Hall and Backdoor renovation - Put in a new back door. Fully strip laundry and hallway.
  • Stage Three: hallway and bedroom - new hallway and with cavity sliding doors closed. The bedroom is 95% finished included raising the ceiling and putting in a double slider. Inbuilt entertainment and waredrobe system.
  • Stage Four: Main Bathroom - Still to be completed